IHE 5&6 Blast Furnace
Demolition, involved the demolition and asbestos abatement of two Blast Furnaces, charging decks, six stoves, scrubbers, and a Highline.
View Project Details
I-294 Bridge
Demolition of (2) existing precast and cast-in-place bridges on I-294 over Grand Ave. and UPRR. Scope of work included a structural engineered approved demolition plan, demolition of the single span Grand Ave. bridge & the 3-span UPRR bridge over (2) active train tracks, demolition of the concrete support piers and abutments, and processing all concrete down to remove reinforcing steel. This work is being completed in (4) phases including day and night shift work, all while I294 stays in operation over the span of 2.5 years.
View Project Details
2AC – Power Generator Station
Demolition and abatement of 13 multi-story boilers and generators. ECC Demolition safely blasted and processed 4 ore bridges over 1000GT each, without any interruptions of shipping canal in four months.
View Project Details
84” Mill
Asbestos Abatement & Demolition of over 2 million square feet of hot strip roll mill, finishing mills, annealing furnaces, roll shops, and shipping facilities.
View Project Details
#11 Battery
Dismantlement of 210-foot steel structure and conveyors over an active 13,000kw substation powering the largest iron producing blast furnace in the northern hemisphere.
View Project Details
333 Lake Street, Bloomingdale
Complete demolition of an 85,000 sf 3-story commercial office structure with a basement parking garage. Scope of work included complete demolition of structure including deep foundations for basement garage, backfill of basement, and stabilization of demolition area.
View Project Details
Carson’s – Matteson
Complete demolition of 162,000sf 2-story Carson Pirie Scott. This Carsons was the last remaining portion of the former Lincoln Mall, a large retail shopping mall, consisting of approximately 750,000 square feet of space that was developed in the early 1970s.
View Project Details
IHW Sinter Plant
Complete demolition of expired sinter plant. Abatement, demolition, and processing of all recyclable materials grossing 6,000 gross tons of steel for recycling. The project was
completed within the client’s timeline.
View Project Details
Little Company of Mary
Dismantlement and demolition of a 12-story bed tower that was situated 11 feet off the newly constructed and operating healthcare facility. Expert scaffolding and the proper heavy-duty equipment allowed for the structural demolition (approximately 285,000 sq. ft.) and crushing of 12-story hospital bed tower at Little Company of Mary Hospital in Evergreen Park, IL.
View Project Details
Metra Ravenswood Bridges
Demolition of (11) existing steel bridges on existing METRA track 2 located from station 595+00 to 701+00 on the Ravenswood Line. Scope of work included a structural engineered approved demolition plan, demolition of (11) bridges, and shoring on multiple span bridges with approved engineered designed prefabricated stackable shoring containers.
View Project Details
Star Plaza & Twin Towers
Demolition of Star Plaza Theater and the (2) 8-story Twin Towers with full basements. All brick, block and concrete was crushed onsite and used to backfill the basements.
View Project Details
State Line Power Plant
When it was initially fired up, this was the largest coal-fired generating plant in the world. Exceeding 350 feet in height (not including smokestacks), this facility was completely demolished to facilitate new development. The project yielded approximately 60,000 gross tons of steel for recycling.