Star Plaza & Twin Towers
Asbestos abatement & demolition of Star Plaza Theater and the (2) 8-story Twin Towers with deep full basements and rooftop mechanical penthouses. Scope of work included asbestos abatement and complete demolition of structures including deep basement foundations, onsite crushing of all brick, block, and concrete, backfill of basement, and stabilization of demolition area.
- Due to its height, this structure utilized our Ultra High Reach Excavator to safely complete the demolition.
- ECC Demolition was also responsible for the SWPPP for this project utilizing silt fence, silt logs and inlet protection.