Project Highlights

Metra Ravenswood Bridges

Demolition of (11) existing steel bridges on existing METRA track 2 located from station 595+00 to 701+00 on the Ravenswood Line. Scope of work included a structural engineered approved demolition plan, demolition of (11) bridges, and shoring on multiple span bridges with approved engineered designed prefabricated stackable shoring containers.

Gallery